MIL-STD-1399-3008
FIGURE 29. Single-phase simulated human body leakage current test setup if user equipment is connected to a single-phase of a three-phase source.
FIGURE 30. Three-phase simulated human body leakage current test setup for user equipment.
52
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business